Design submission to "approved for order" wait time?

I’ve searched for an answer in the FAQ, etc. to no avail. Once a design has been submitted to batchpcb, how long before the design status changes from “submitted”? I think the bot’s run DRC on my files. Is there also some level of manual approval that has to also take place before I can order?