I’ve placed two orders so far, one of them two weeks ago, and one of them last thursday.
The first order was a set of gerbers someone else had done, that had been ordered through sparkfun before, so I knew they were good. I got a confirmation email shortly after saying they’d passed DRC and were being panelized.
The second order was a layout I did myself, and so I’m not 100% sure that it would pass DRC. Haven’t heard back on this yet.
Today I get an email saying that the second order has shipped. I’m really curious to see exactly what I get in the mail
sorry to hijack your thread, but i submitted them, but the pads were too close, so i had to fix it, but i also got an order shipped email. whats goin on?
We had a glitch in the matrix and sent out a bunch of shipping confirmations for PCBs that we didn’t actually have. Sorry! They orders take 10-18 days to ship.
We’ve got a lot of orders for the PassMe PCB. It’s some Nintendo DS Mod? Not really sure. We would like to batch a bunch of them, but the layout seems to change and we’d hate to send a layout to someone that is an old version.
Let me know if the design settles down and we’ll offer it on the SFE site.
I think I’m at 16 days on that second order, the ARP board, and still no DRC confirmation, I hope all is well.
The passme is in an interesting state right now It’s used to allow the DS to boot and run homebrew code off the GBA slot, by using a CPLD to rewrite the header as it boots off a real cart. It’s sort of an intermediate stepping stone until we get something better, so I don’t know if it would be worth pouring a lot of resources into.
That said, the people that are building them and selling them have had much more demand than anticipated, so at some point I might like to talk to you guys about maybe doing a whole panel or two.
Is it possible you could check on the status of order 5164? I’d love to know if it passed DRC at least